Paraquita Bay, Tortola
February 2002
$78K
Supply and installation of 43 No. steel pipe piles for the foundations of this Community College Building.
Nanny Cay Condominium Substructure Tortola, BVI
October 2006 - in progress
$1.8M
Installation of prestresssed concrete piles and all concrete structures up to the top of the ground floor to eventually include 8 condominium blocks.
Maho Beach Residence PilingVirgin Gorda, BVI
December 2007
Installation of 120 precast concrete piles under a private house on the beach at Maho Bay.
Crown Bay, St. Thomas, USVI
October 1998 - November 1998
$34K
Installation of 16 hollow steel pipes 65ft. long for foundations for a bridge and dredging next to bulkhead to deepen berth to a depth of 30ft, as sub-contractor to Majestic Construction, Inc. St. Thomas.
Banco Popular New Branch BuildingRoad Town, Tortola, BVI
August 2003 - November 2003
$475K
Supply and installation of 77 Nr. steel pipe piles and pile cap beams for the new Tortola Branch building.